Crystal Springs Family Aquatic Center

Project Specs

  • Property Type: Aquatic Center
  • Location: Brunswick, NJ
  • Project Size: 4,620 square feet
  • Our Role: Butler Pre-Engineered Steel Design & Erection
  • Butler Products: Lester 28 gauge walls and roof
Download Project Sheet

Water Park Commercial Construction

This project was designed to house Member Services, Staff Accommodations, First Aid, Locker Rooms and a Full Service Food Concession Facility at a family water park.

The owner was looking for an economical solution to a project originally bid at twice the cost. Systems construction provided significant savings along with allowing completion during a tight seasonal shut-down. Butler's Lester 28 gauge metal roofing and walls were used. Demolition of existing buildings started the day after the park shut down and concrete needed to be finished allowing the building to continue through the winter.

Hance tailored construction to meet our client’s need for an economical solution. 

The primary design directives were low maintenance in a wet, high-traffic environment and efficient interaction with the public.

Finally, the owner was looking for an appealing structure to attract membership which increased significantly upon completion.